Schedule Studio connector

Generate, edit and question your nPlan Schedule Studio construction schedules from Claude and other AI assistants that support remote MCP connectors.

What you can do

Requirements

Connect

Connector URL:

https://mcp.schedule-studio.nplan.io/mcp

  1. Add the connector in your AI assistant. In Claude, add it from the connectors directory, or add a custom connector with the URL above. Leave any client ID and client secret fields empty.
  2. You are sent to the nPlan sign-in page. Sign in as you normally do for Schedule Studio.
  3. Review the consent page and choose the workspace to connect: your personal workspace or one of your organisations. The assistant can only see projects in that workspace. To switch workspace, disconnect and connect again.

Example prompts

Good to know

Tools

Read only

List projects
schedulestudio_list_projects
List all Schedule Studio projects accessible to the current user. Returns project IDs, names, and metadata.
Get project
schedulestudio_get_project
Get detailed information about a specific Schedule Studio project, including its metadata and summary.
List project documents
schedulestudio_list_files
List all uploaded documents for a project. Returns file IDs, names, types, and processing status.
Get document content
schedulestudio_get_file_content
Get the extracted text content and facts from a processed file. The file must have been processed by the file_processor job first.
Get default phases
schedulestudio_get_default_phases
List the standard project phase titles Schedule Studio offers when setting up a WBS. Use them as a starting point for the phase_titles of schedulestudio_create_internal_wbs.
Get schedule overview
schedulestudio_get_overview
Get the overview of an OVERVIEW (or HLS) schedule for review before generating activities: the written project summary and each phase's id, title and description. Milestones are listed by schedulestudio_get_milestones.
List schedules
schedulestudio_list_schedules
List all schedules for a project. Returns schedule IDs, names, types (EMPTY, WBS, HLS, FULL), and status information.
Get schedule
schedulestudio_get_schedule
Get a schedule's metadata: name, status, type, source, estimated dates, integrity rating and pipeline progress. It does not include activities; use schedulestudio_get_schedule_stats, schedulestudio_search_activities or schedulestudio_get_activity for those.
Export schedule as XER
schedulestudio_export_schedule
Export a schedule in Primavera P6 XER format. Returns a download_url for the XER file.
Get WBS
schedulestudio_get_wbs
Get the Work Breakdown Structure for a schedule. Returns the hierarchical WBS tree with phase titles and task groupings.
Get milestones
schedulestudio_get_milestones
List all milestones in a schedule with their ids, names, types, target dates and status. Use the ids with schedulestudio_update_milestone and schedulestudio_delete_milestone.
Get job status
schedulestudio_get_job_status
Check the progress of a long-running operation. With only schedule_id, returns the schedule's pipeline status (for create_overview, create_internal_wbs, generate_hl_schedule, expand_schedule, blindly_create_schedule, etc.). With journal_id and request_id, returns the status of an edit_schedule or expand_tasks request.
Get schedule stats
schedulestudio_get_schedule_stats
Headline numbers for a schedule without downloading it: activity count (by type), milestone count, WBS node count and depth, link count by relationship type (FS/SS/FF/SF), start and finish dates, critical activity count, duration statistics, open ends and calendars. Use this first for questions like 'how many activities does this schedule have' or 'when does it finish'.
Search activities
schedulestudio_search_activities
Find activities by name or code text, WBS branch, type, date window, duration or criticality. Returns a page of compact rows (id, code, name, type, start, finish, duration, critical, WBS) plus total_matches, so it also answers counting questions such as 'how many activities start in March'.
Get activity
schedulestudio_get_activity
Everything about one activity: dates, duration, type, calendar, progress, WBS path, predecessors and successors with relationship types, assigned resources, and Schedule Studio's explanation of its duration and labour hours. Identify it by activity_id or code.
Get critical path
schedulestudio_get_critical_path
The activities on the critical path to a milestone (default: the finish milestone), in date order, with its start, finish and length. Set near_critical_float_days to also list near-critical activities whose float is within that many days of the critical path. Both lists include the staged (accepted, not yet committed) edits of the schedule's journal, as the Gantt shows them; journal_id in the answer names that journal. The other query tools read the committed version.
Get WBS rollup
schedulestudio_get_wbs_rollup
Per WBS node, down to a chosen depth: activity, milestone and critical activity counts, start, finish, span in calendar days and labour hours. Answers 'which phase is longest' or 'how many activities are in Civils'. Pass wbs_id to roll up one branch.
Get schedule health
schedulestudio_get_schedule_health
Schedule integrity: the overall red/amber/green rating with reasons and a count plus rating for each check (open ends, negative float, long durations, constraints, lags and so on). Pass check (a key from the checks map, e.g. 'noPredecessors') to list the activities or links that fail it.
Get schedule summary
schedulestudio_get_schedule_summary
What a project and schedule are about: project name and description, schedule name, status, industry, location, estimated dates and integrity rating, and Schedule Studio's written summary of the schedule.
Get resources
schedulestudio_get_resources
Resources in a schedule (labour, equipment, material) with how many activities each is assigned to and its total target units, busiest first.
Get edit history
schedulestudio_get_edit_history
Recent editing sessions on a schedule, newest first, with each edit request's prompt, status and time. Answers 'what changed in this schedule and why'.
Describe schedule capabilities
schedulestudio_describe_capabilities
What a schedule allows right now: its lifecycle state, one verdict per policy family (A allowed, C makes a new version, R needs credits, X refused), the version token, and the credit owner and balance when known. Call it before a write and after a refusal.
Get playbook
schedulestudio_get_playbook
The fixed playbook for working with Schedule Studio: the lifecycle states, what each allows, how refusals and jobs work, and when to stop and ask the user. Read it once at the start of a session.

Create or change data

Tools marked destructive replace what is shown in Schedule Studio; earlier versions are kept.

Create project
schedulestudio_create_project
Create a new Schedule Studio project.
Get document upload URL
schedulestudio_get_upload_url
Step 1 of uploading a large document (over 10 MB) or one you cannot read into this conversation: generate a signed upload URL for a project. Returns a file_id and a signed_url. PUT the raw file bytes to signed_url, then call schedulestudio_upload_file with the file_id. For files up to 10 MB, skip this and pass content_text or content_base64 to schedulestudio_upload_file instead.
Register uploaded document
schedulestudio_upload_file
Upload a document (such as a specification) to a project. Pass the file itself as content_text or content_base64 (up to 10 MB), or, for larger files, the file_id of a file already PUT to the signed URL from schedulestudio_get_upload_url. Pass exactly one of file_id, content_text and content_base64. File processing (text and fact extraction) starts automatically; poll schedulestudio_list_files until its status is PROCESSED.
Retry document processing
schedulestudio_retry_file_processing
Retry processing of an uploaded file whose status is FAILED. Processing starts automatically on upload, so only use this after a failure.
Create empty schedule
schedulestudio_create_schedule
Create a new EMPTY schedule in a project from a project description and processed files. This is the starting point for the staged generation pipeline (schedulestudio_create_internal_wbs or schedulestudio_extract_wbs, then schedulestudio_create_overview, then schedulestudio_generate_hl_schedule), or for schedulestudio_blindly_create_schedule, which runs the whole pipeline in one step.
Generate schedule overview
schedulestudio_create_overview
Generate the schedule overview (summary, phase descriptions and milestones) from a WBS schedule. Run it once schedulestudio_create_internal_wbs or schedulestudio_extract_wbs has completed. Uses the schedule's current WBS, or an edited tree passed as wbs. Creates a new OVERVIEW schedule and returns it; use the returned schedule ID and poll schedulestudio_get_job_status until it completes. Then review it with schedulestudio_get_overview and schedulestudio_get_milestones, adjust it if needed, and call schedulestudio_generate_hl_schedule with it.
Generate WBS
schedulestudio_create_internal_wbs
Start generating an nPlan Work Breakdown Structure for an EMPTY schedule. Phase titles are optional; if omitted they are derived from the project's documents. schedulestudio_get_default_phases lists the standard phase titles to start from. Returns the schedule; poll schedulestudio_get_job_status until it completes, then review it with schedulestudio_get_wbs.
Extract WBS from schedule file
schedulestudio_extract_wbs
Trigger the wbs_file_processor Cloud Run job. Extracts a Work Breakdown Structure from uploaded XER or P6 XML files. Returns a job ID.
Generate high-level schedule
schedulestudio_generate_hl_schedule
Generate the high-level schedule from an OVERVIEW schedule (the one returned by schedulestudio_create_overview), or regenerate an existing HLS schedule. Generates activities from the WBS and milestones, sequences them, assigns durations, and runs CPM scheduling. Consumes credits. Creates a new HLS schedule and returns it; use the returned schedule ID and poll schedulestudio_get_job_status until it completes.
Update schedule overview
schedulestudio_update_overview
Change an OVERVIEW schedule's written summary and/or phase descriptions before calling schedulestudio_generate_hl_schedule. The summary is used as project context when durations, resources and milestones are generated. Pass at least one of summary or phases. Phase ids come from schedulestudio_get_overview; phases not listed are unchanged.
Add milestone
schedulestudio_add_milestone
Add a milestone to an OVERVIEW schedule before generating the high-level schedule, optionally with a target date. The schedule's pipeline status must be SUCCESS.
Update milestone
schedulestudio_update_milestone
Rename a milestone and/or change its target date on an OVERVIEW schedule. Milestone ids come from schedulestudio_get_milestones; omitted fields are unchanged.
Delete milestone (destructive)
schedulestudio_delete_milestone
Remove a milestone from an OVERVIEW schedule so the high-level schedule is generated without it. Milestone ids come from schedulestudio_get_milestones.
Regenerate schedule from WBS
schedulestudio_regenerate_schedule
Regenerate an existing high-level (HLS) schedule from its WBS, or from an edited tree passed as wbs: rebuilds the overview and then the activities in one run. Consumes credits. Creates a new OVERVIEW schedule, from which a new HLS schedule is generated; poll schedulestudio_get_job_status with the returned ID, then find the new HLS schedule with schedulestudio_list_schedules. Previous versions are kept.
Request AI schedule edit
schedulestudio_edit_schedule
Request an AI edit to a schedule from a natural language prompt. Edits are generated asynchronously into an editing session (journal). Returns journal_id and edit_request; poll schedulestudio_get_job_status with journal_id and request_id, then call schedulestudio_commit_edits to save the edits as a new schedule version.
Expand activities into subtasks
schedulestudio_expand_tasks
Generate subtasks for a set of activities in a schedule. Runs asynchronously inside an editing session (journal). Returns journal_id and edit_request; poll schedulestudio_get_job_status with journal_id and request_id, then call schedulestudio_commit_edits to save the result.
Commit schedule edits (destructive)
schedulestudio_commit_edits
Save the edits in an editing session (from schedulestudio_edit_schedule or schedulestudio_expand_tasks) as a new version of the schedule. Only call once the edit requests have completed.
Expand whole schedule
schedulestudio_expand_schedule
Trigger the expand_schedule Cloud Run job. Expands all tasks in the schedule into subtasks, sequences them, assigns durations, and runs CPM scheduling. Returns a job ID.
Get schedule import URL
schedulestudio_get_schedule_upload_url
Step 1 of importing a large schedule file (.xer, .xml or .pp over 10 MB) or one you cannot read into this conversation: generate a signed upload URL for a project. Returns a schedule_id and a signed_url valid for 15 minutes. PUT the raw file bytes to signed_url, then call schedulestudio_import_schedule with the schedule_id. For files up to 10 MB, skip this and pass content_text or content_base64 to schedulestudio_import_schedule instead. For documents such as specifications, use schedulestudio_upload_file instead.
Import schedule file
schedulestudio_import_schedule
Import an existing schedule file (.xer, .xml or .pp) into a project as a new schedule. Pass the file itself as content_text or content_base64 (up to 10 MB), or, for larger files, the schedule_id of a file already PUT to the signed URL from schedulestudio_get_schedule_upload_url. Pass exactly one of schedule_id, content_text and content_base64. The file is parsed immediately and the new schedule is returned ready to query.
Actualise activities
schedulestudio_actualise_activities
Record progress on a schedule: set actual start and finish dates and remaining durations for activities, matched by activity code. Creates a new ACTUALISED version of the schedule with the actuals applied in the background; the source schedule is not changed. Returns the new schedule_id: poll schedulestudio_get_job_status with it until status is SUCCESS. Existing actual dates are never overwritten; activities whose dates clash with them are skipped and listed in status_message. Use schedulestudio_search_activities to find activity codes first. Uses the same actualisation as uploading a progress file in the Schedule Studio web app.
Actualise from progress file
schedulestudio_actualise_from_file
Actualise a schedule from a progress file (.csv, .tsv, .xls, .xlsx or .ods) that has an activity code column and actual start and/or actual finish columns, optionally remaining duration and a data date. Upload the file first: call schedulestudio_get_upload_url, PUT the file bytes to its signed_url, then call this tool with the returned file_id (do not call schedulestudio_upload_file). Creates a new ACTUALISED version of the schedule with the actuals applied in the background; poll schedulestudio_get_job_status with the returned schedule_id. To enter actuals directly, use schedulestudio_actualise_activities instead.
Generate full schedule
schedulestudio_blindly_create_schedule
Trigger the blindly_create_schedule Cloud Run job on an EMPTY schedule. This orchestrates the entire schedule creation pipeline automatically: generate internal WBS -> create overview -> generate high-level schedule, each stage on a new schedule. This is a long-running operation (can take 30+ minutes). Returns the run's new WBS schedule: poll schedulestudio_get_job_status with its id. The status follows the run through every stage; once status is SUCCESS, the returned id is the finished high-level schedule.
Compare schedules
schedulestudio_compare_schedules
Compare two schedules (e.g. two versions). Returns counts of added, removed and changed WBS nodes, activities and links, and changes to start, finish, duration and critical path length. The comparison runs in the background: if status is not 'success', call again with the same IDs. Optionally include an AI executive summary and critical-path narrative (slower).

Data and security

Disconnect

Remove the connector in your AI assistant's settings. Its tokens then stop being used and expire. To have your connection revoked immediately, email support@nplan.io.

Support

Email support@nplan.io with the time of the problem and the assistant you were using.